Toadvine Enterprises completed a comprehensive gymnasium seating and equipment upgrade featuring two new banks of telescopic bleachers and a full suite of athletic equipment. The project included one bleacher bank measuring 85' 7" in length and a second measuring 88', each configured with 11 rows and equipped with self-storing end rails for enhanced safety and efficient operation. Total seating capacity for the space is approximately 534 spectators.
In addition to seating, the scope of work included the installation of basketball backstops, backboards, goals, winches, and control equipment, along with volleyball equipment and protective wall padding to support multi-sport use of the facility. A new Nevco interior electronic basketball scoreboard was also installed to modernize game-day operations and improve the overall fan and athlete experience.
All bleachers and equipment were professionally installed by Toadvine, ensuring code compliance, seamless integration, and long-term performance for the facility.